Traditional Construction Vs LMIC Construction

Traditional

Cutting and installing Individual framing members On-site.

Separate insulation layers

Heavy on-site labor required

Long construction timeline

Lmic

Factory-made and ready to assemble

Energy-efficient with foam insulation

Faster construction timeline

Provides structural support for walls, roofs, and floors

Minimum on-site labor required